Number of Charging Stations:

44

How Resorts World Casino Elevated Its EV Charging Capabilities

Summary

How Resorts World Casino Elevated Its EV Charging Capabilities

As electric vehicles (EVs) gain popularity, destinations like Resorts World Casino in Jamaica, NY, are seizing the opportunity to enhance their amenities by installing commercial EV charging infrastructure. Resorts World Casino aimed to provide accessible, eco-friendly charging options for its visitors, with plans to install 44 Level 2 charging ports open to the public.

The project required seamless planning, coordination with local utilities, and efficient installation to meet the casino’s high standards. Resorts World Casino partnered with Source Forward and DVM Industries to handle the entire process, ensuring the project was completed smoothly, on time, and within budget.

The Challenge

Resorts World Casino faced several challenges in bringing its vision of EV charging infrastructure to life:

  1. Large-Scale Installation: Installing 44 charging ports required significant electrical upgrades and careful planning to avoid disruptions to the casino’s operations.
  2. Permitting and Compliance: Securing approvals and meeting all local and state regulations for a high-traffic public location added complexity to the project.
  3. Cost Management: With an initial project cost of $660,000, the casino wanted to maximize rebates and incentives to make the installation financially viable.

The Solution

Source Forward and DVM Industries managed the entire project, addressing each challenge with expertise and efficiency:

1. Comprehensive Project Oversight

From the initial design phase to the final installation, our team handled every aspect of the project. This included:

  • Conducting a thorough site assessment to determine the best locations for the chargers.
  • Designing a layout that ensured ease of use for visitors while maintaining the casino’s aesthetic appeal.

2. Permitting and Compliance

Our team secured all necessary permits and ensured compliance with local regulations, streamlining the process and preventing delays.

3. Maximizing Incentives

Source Forward and DVM Industries managed all rebate applications and utility paperwork, securing $594,000 in rebates—covering nearly 90% of the total project cost.

4. Efficient Installation

We coordinated with contractors to complete the installation with minimal disruption to the casino’s operations. The work included:

  • Upgrading electrical infrastructure to support the new chargers.
  • Installing and commissioning 44 state-of-the-art Level 2 charging ports.
  • Setting up networked software for payment collection and utility reporting.

Results

The project was a resounding success, transforming Resorts World Casino into a destination for EV drivers while showcasing its commitment to sustainability.

Key Highlights:

  • Charging Ports Installed: 44 Level 2 ports, open to the public.
  • Total Project Cost: $660,000.
  • Rebates Secured: $594,000, reducing the net cost to just $66,000.
  • Enhanced Visitor Experience: EV drivers can now conveniently charge their vehicles while enjoying the casino’s amenities.

Why Partner with Source Forward?

Source Forward and DVM Industries’ end-to-end project management ensured a smooth, efficient installation process for Resorts World Casino. From securing incentives to handling complex regulatory requirements, our expertise delivered exceptional value, transforming parking spaces into sustainable, revenue-generating assets.

If your business is ready to install EV charging stations, Source Forward can guide you through every step, ensuring a cost-effective and seamless solution. Contact us today to learn how we can help you achieve your green energy goals.